Supplemental Bid

Invitation to Bid

 
Reference No. Description Posted by
BID-BULLETIN-DSWD7-PB-2019-16.pdf Provision of Security Manpower Services for VDRC for CY 2019 Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
December 4, 2018  ₱ 1,200,000.00 DEC-04-18 DEC-11-18
  0 downloads for this document last download from on November 30, -0001.    
Reference No. Description Posted by
BID-BULLETIN-DSWD7-PB-2019-15.pdf Rebidding of Provision of Board and Lodging and Venue for Various DSWD Activities in Cebu with previous ITB No. DSWD7-PB-2019-10 Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
December 4, 2018  ₱1,532,400.00 Dec-04-18 Dec-11-18
  0 downloads for this document last download from on November 30, -0001.    
Reference No. Description Posted by
MINUTES-OF-PRE-BID-DSWD7-PB-2019-14.pdf Rebidding of Supply and Delivery of Groceries for CY 2019 with previous ITB No. DSWD7-PB-2019-09 Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
November 23, 2018  ₱ 2,538,073.00 NOV-23-18 MMM-DD-YY
  2 downloads for this document last download from 49.148.57.168 on December 2, 2018.    
Reference No. Description Posted by
BID-BULLETIN-DSWD7-PB-2019-11-2.pdf CHANGES IN DATE SCHEDULE OF BID OPENING DUE TO CANCELLED OF TRIPS FROM BOHOL TO CEBU BECAUSE OF TYPHOON SAMUEL Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
November 20, 2018  ₱ 1,120,500.00 NOV-20-18 NOV-26-18 2:45 PM
  0 downloads for this document last download from on November 30, -0001.    
Reference No. Description Posted by
BID-BULLETIN-13-1.pdf Supplemental/Bid Bulletin

Addendum No. 1
November 20, 2018

ITB No. DSWD7-PB-2019-13

PROVISION OF BOARD AND LODGING AND VENUE FOR VARIOUS PANTAWID PAMILYA ACTIVITIES IN CEBU

This Addendum No. 1 of ITB No. DSWD7-PB-2019-13 is issued to clarify and/or amend, pursuant to Section 22.5 of the IRR of Republic Act 9184, certain provision on the Bidding Documents issued for this project as follows:
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
November 20, 2018  ₱ 2,889,000.00 NOV-20-18 NOV-27-18
  1 downloads for this document last download from 122.55.232.226 on November 27, 2018.    
Reference No. Description Posted by
BID-BULLETIN-DSWD7-PB-2019-11-1.pdf Supplemental/Bid Bulletin
Addendum No. I November 9, 2018
ITB No. DSWDT-PB-2019-1 I PROVISION OF BOARD AND LODGING AND VENUE FOR VARIOUS DSWD ACTIVITIES IN BOHOL Issued pursuant to Section 22.5 ofthe IRR ofRepublic Act 9 r g4 to clarifu and/or ament certain provision on the Bidding Documents issued for this p.o.je"i, consraering the issues raised and clari{cations 11de by prospective bidder's au.ing tri. drJid conference herd on November8,2018, and shall form an integral part thereof. ui", -
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
November 13, 2018  ₱ 1,120,500.00 NOV-13-18 NOV-20-18
  1 downloads for this document last download from 203.177.19.106 on November 26, 2018.    
Reference No. Description Posted by
BID-BULLETIN-DSWD7-PB-2019-10-1.pdf Supplemental/Bid Bulletin
Addendum No. 1 November 9, 2018
ITB No. DSWDT-PB-2019-10
PROVISION OF BOARD AND LODGING AND VENUE FOR VARIOUS DSWD ACTIVITIES IN CEBU
Issued pursuant to Section 22.5 ofthe IRR ofRepublic Act 9184 to clarify and/or ament certain provision on the Bidding Documents issued for this project, considering the issues raised and clarifications made by prospective bidder's during the Prebid Conference held on November 8, 2018, and shall form an integral part thereof, viz:
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
November 13, 2018  ₱ 1,532,400.00 NOV-13-18 NOV-20-18
  0 downloads for this document last download from on November 30, -0001.    
Reference No. Description Posted by
MINUTES-PRE-BID-2019-11.pdf Provision of Board and Lodging and Venue for Various DSWD Activities in Bohol Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
November 12, 2018  ₱ 1,120,500.00 Nov-08-18
  0 downloads for this document last download from on November 30, -0001.    
Reference No. Description Posted by
MINUTES-PRE-BID-DSWD7-PB-2019-10.pdf Provision of Board and Lodging and Venue for Various DSWD Activities in Cebu Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
November 12, 2018  ₱ 1,532,400.00 NOV-08-18 MMM-DD-YY
  0 downloads for this document last download from on November 30, -0001.    
Reference No. Description Posted by
BID-BULLETIN-07-03.pdf Supplemental/Bid Bulletin

Addendum No. 3
November 5, 2018

ITB No. DSWD7-PB-2019-07

PROVISION OF JANITORIAL MANPOWER SERVICES FOR CY 2019

This Addendum No. 3 of ITB No. DSWD7-PB-2019-07 is issued to inform the public about the postponement of submission of bids and bid opening of ITB No. DSWD7-PB-2019-07, Provision of Janitorial Manpower Services for CY 2019 and to clarify and/or amend, pursuant to Section 22.5 of the IRR of Republic Act 9184, certain provision on the Bidding Documents issued for this project as follows
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
November 5, 2018  ₱ 0.00 NOV-05-18 NOV-13-18
  2 downloads for this document last download from 91.242.162.25 on November 28, 2018.    
Reference No. Description Posted by
BID-BULLETIN-01-3.pdf Supplemental/Bid Bulletin

Addendum No. 3
November 5, 2018

ITB No. DSWD7-PB-2019-01

PROVISION OF SECURITY MANPOWER SERVICES FOR CY 2019

This Addendum No. 3 of ITB No. DSWD7-PB-2019-01 is issued to inform the public about the postponement of submission of bids and bid opening of ITB No. DSWD7-PB-2019-01, Provision of Security Manpower Services for CY 2019 and to clarify and/or amend, pursuant to Section 22.5 of the IRR of Republic Act 9184, certain provision on the Bidding Documents issued for this project as follows
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
November 5, 2018  ₱ NOV-05-18 NOV-13-18
  2 downloads for this document last download from 203.177.19.106 on November 29, 2018.    
Reference No. Description Posted by
Bid-Bulletin-2019-1-2.pdf Supplemental/Bid Bulletin

Addendum No. 2
October 29, 2018

ITB No. DSWD7-PB-2019-01

PROVISION OF SECURITY MANPOWER SERVICES FOR CY 2019

Issued pursuant to Section 22.5 of the IRR of Republic Act 9184 to clarify and/or ament certain provision on the Bidding Documents issued for this project, considering the issues raised and clarifications made by prospective bidder’s during the Prebid Conference held on October 18, 2018, and shall form an integral part thereof, viz:
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
October 31, 2018  ₱ 9,084,000.00 OCT-31-18 NOV-6-18
  3 downloads for this document last download from 175.158.226.101 on November 15, 2018.    
Reference No. Description Posted by
Bid-Bulletin-ITB-No.-DSWD7-PB-2019-07-2.docx Supplemental/Bid Bulletin

Addendum No. 2
October 30, 2018


ITB No. DSWD7-PB-2019-07

PROVISION OF JANITORIAL MANPOWER SERVICES FOR CY 2019

Issued pursuant to Section 22.5 of the IRR of Republic Act 9184 to clarify and/or ament certain provision on the Bidding Documents issued for this project, considering the issues raised and clarifications made by prospective bidder’s during the Prebid Conference held on October 19, 2018, and shall form an integral part thereof, viz:
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
October 31, 2018  ₱ 1,845,000.00 OCT-31-18 NOV-7-18
  2 downloads for this document last download from 175.158.226.98 on November 18, 2018.    
Reference No. Description Posted by
Bid-Bulletin-ITB-No.-DSWD7-PB-2019-09.pdf Supplemental/Bid Bulletin

Addendum No. 1
October 30, 2018

ITB No. DSWD7-PB-2019-09

SUPPLY AND DELIVERY OF GROCERIES FOR CY 2019


Issued pursuant to Section 22.5 of the IRR of Republic Act 9184 to clarify and/or ament certain provision on the Bidding Documents issued for this project, considering the issues raised and clarifications made by prospective bidder’s during the Prebid Conference held on October 25, 2018, and shall form an integral part thereof, viz:
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
October 30, 2018  ₱ 2,538,073.00 OCT-30-18 NOV-06-18
  1 downloads for this document last download from 119.93.156.220 on November 5, 2018.    
Reference No. Description Posted by
Supplemental-Bid-Bulletin-ITB-08.pdf Supplemental/Bid Bulletin

Addendum No. 1
October 26, 2018

ITB No. DSWD7-PB-2019-08

SUPPLY AND DELIVERY OF TONERS FOR CY 2019
Issued pursuant to Section 22.5 of the IRR of Republic Act 9184 to clarify and/or ament certain provision on the Bidding Documents issued for this project, considering the issues raised and clarifications made by prospective bidder’s during the Prebid Conference held on October 22, 2018, and shall form an integral part thereof, viz:
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
October 27, 2018  ₱ 5,694,416.00 Oct-27-18 Nov-05-18
  1 downloads for this document last download from 91.242.162.25 on November 28, 2018.    
Reference No. Description Posted by
BID-BULLETIN-06-1.pdf Supplemental/Bid Bulletin

Addendum No. 1
October 26, 2018
ITB No. DSWD7-PB-2019-06

SUPPLY AND DELIVERY OF INFANT MILK AND CEREALS FOR CY 2019
Issued pursuant to Section 22.5 of the IRR of Republic Act 9184 to clarify and/or ament certain provision on the Bidding Documents issued for this project, considering the issues raised and clarifications made by prospective bidder’s during the Prebid Conference held on October 22, 2018, and shall form an integral part thereof, viz:
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
October 27, 2018  ₱ 1,351,200.00 Oct-27-18 Nov-05-18
  0 downloads for this document last download from on November 30, -0001.    
Reference No. Description Posted by
BID-BULLETIN-44-1.pdf Supplemental/Bid Bulletin
Addendum No. 1
October 26, 2018
ITB No. DSWD7-PB-2018-44
SUPPLY AND DELIVERY OF CARDBOARD BOXES
Issued pursuant to Section 22.5 of the IRR of Republic Act 9184 to clarify and/or amend certain provision on the Bidding Documents issued for this project, considering the issues raised and clarifications made by prospective bidder’s during the Prebid Conference held on October 22, 2018, and shall form an integral part thereof, viz:
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
October 27, 2018  ₱ 3,500,000.00 Oct-27-18 Nov-05-18
  0 downloads for this document last download from on November 30, -0001.    
Reference No. Description Posted by
BID-BULLETIN-DSWD7-PB-2019-03-1.pdf
PROVISION OF PETROLEUM, OIL AND LUBRICANTS FOR CY 2019 USING FLEET CARD FACILITY


Issued pursuant to Section 22.5 of the IRR of Republic Act 9184 to clarify and/or ament certain provision on the Bidding Documents issued for this project, considering the issues raised and clarifications made by prospective bidder’s during the Prebid Conference held on October 19, 2018, and shall form an integral part thereof, viz:
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
October 24, 2018  ₱ 2,160,000.00 Oct-24-18 Oct-31-18
  0 downloads for this document last download from on November 30, -0001.    
Reference No. Description Posted by
BID-BULLETIN-7.pdf This Addendum No. 1 of ITB No. DSWD7-PB-2019-07 dated October 23, 2018 is issued to inform the public about the postponement of submission of bids and bid opening of ITB No. DSWD7-PB-2019-07, Provision of Janitorial Manpower Services for CY 2019, and shall form an integral part thereof, viz:
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
October 23, 2018  ₱ 1,845,000.00 Oct-23-18 Nov-07-18
  1 downloads for this document last download from 122.55.232.226 on November 5, 2018.    
Reference No. Description Posted by
BID-BULLETIN-1.pdf This Addendum No. 1 of ITB No. DSWD7-PB-2019-01 dated October 23, 2018 is issued to inform the public about the postponement of submission of bids and bid opening of ITB No. DSWD7-PB-2019-01, Provision of Security Manpower Services for CY 2019, and shall form an integral part thereof, viz: Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
October 23, 2018  ₱ 8,192,400 Oct-23-18 Nov-07-18
  1 downloads for this document last download from 175.158.226.101 on November 15, 2018.    
Reference No. Description Posted by
MINUTES-PRE-BID-DSWD7-PB-2019-07.pdf Provision of Janitorial Manpower Services for CY 2019

Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
October 22, 2018  ₱ 1,845,000.00 OCT-19-18 MMM-DD-YY
  1 downloads for this document last download from 203.177.19.106 on November 20, 2018.    
Reference No. Description Posted by
MINUTES-PRE-BID-DSWD7-PB-2019-03.pdf Provision of Petroleum, Oil and Lubricants for CY 2019 using Fleet Card Facility

Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
October 22, 2018  ₱ 2,160,000.00 OCT-19-18 MMM-DD-YY
  0 downloads for this document last download from on November 30, -0001.    
Reference No. Description Posted by
MINUTES-PRE-BID-DSWD7-PB-2019-01.pdf Provision of Security Manpower Services for CY 2019 Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
October 22, 2018  ₱ 8,192,400.00 OCT-18-18 MMM-DD-YY
  0 downloads for this document last download from on November 30, -0001.    
Reference No. Description Posted by
DSWD7-PB-2019-05.pdf Supply and Delivery of Fresh and Dried Fish for
CY 2019
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
October 22, 2018  ₱ 1,166,512.50 Oct-22-18 MMM-DD-YY
  0 downloads for this document last download from on November 30, -0001.    
Reference No. Description Posted by
DSWD7-PB-2019-04.pdf Supply and Delivery of Food Items – Meat (Pork, Beef & Chicken)

Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
October 22, 2018  ₱ 1,294,007.00 Oct-22-18 MMM-DD-YY
  0 downloads for this document last download from on November 30, -0001.    
Reference No. Description Posted by
Minutes-41.pdf MINUTES OF PRE-BID CONFERENCE September 24, 2019. 1 0:00 A.M. HAVEN Conference Room, Labangon Cebu City
Rebidding of Construction of PWD's Accessibility and Ground Improvement for Regional ,Haven
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
September 28, 2018  ₱ 1,818,900.00 Sep-24-18 MMM-DD-YY
  3 downloads for this document last download from 91.242.162.4 on November 27, 2018.    
Reference No. Description Posted by
BID-BULLETIN-ITB-40.pdf Supplemental/Bid Bulletin
This Addendum No. DSWDT-PB-2018-40-1 dated September 2l,2018 is issued to inform the public about the amendments
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
September 24, 2018  ₱ 0.00 Sep-24-18 MMM-DD-YY
  5 downloads for this document last download from 203.177.19.106 on October 18, 2018.    
Reference No. Description Posted by
MINUTES-40.pdf Provision of Board and Lodging and Venue for the Rollout Training on “Makilahok” or Barangay Development Planning and Management Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
September 24, 2018  ₱ 9,387,000.00 Sep-20-18 MMM-DD-YY
  2 downloads for this document last download from 203.177.19.106 on October 8, 2018.    
Reference No. Description Posted by
MINUTES-27.pdf Construction of RRCY Vocational Training Center and School Building Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
September 19, 2018  ₱8,140,000.00 MMM-DD-YY MMM-DD-YY
  2 downloads for this document last download from 66.249.75.143 on October 22, 2018.    
Reference No. Description Posted by
MINUTES-26.pdf Improvement of Existing RRCY Kitchen Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
September 19, 2018  ₱3,088,000.00 MMM-DD-YY MMM-DD-YY
  1 downloads for this document last download from 66.249.66.27 on October 1, 2018.    
Reference No. Description Posted by
MINUTES-25.pdf Construction of PWD's Accessibilify and Ground Improvement for Regional Haven ITB No. DSWDT-PB-2018-25
MINUTES OF PRE.BID CONFERENCE August 14, 2018, 10:30 AM Regional Haven Conference Room, Camomot-Franza,Labangon, Cebu City
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
September 19, 2018  ₱ 1,818,900.00 MMM-DD-YY MMM-DD-YY
  2 downloads for this document last download from 52.5.77.183 on October 14, 2018.    
Reference No. Description Posted by
BID-BULLETIN-39.pdf Repair and Improvement of RRCY Main Building

Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
September 13, 2018  ₱1,496,000.00 Sep-13-18 MMM-DD-YY
  3 downloads for this document last download from 91.242.162.4 on November 27, 2018.    
Reference No. Description Posted by
BID-BULLETIN-38.pdf Repair and Improvement of Home for Girls Road Network, Drainage System, Dormitory CR, Roofing and Ceiling of Administrative Building, Gate and Laundry Area

Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
September 13, 2018  ₱ 1,550,211.00 Sep-13-18 MMM-DD-YY
  2 downloads for this document last download from 66.249.66.25 on October 1, 2018.    
Reference No. Description Posted by
BID-BULLETIN-37.pdf Repair and Improvement of AVRC II Road Network, Guardhouse, Back gate, Drainage System, Canteen, Front Gate Canopy and Water Pump

Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
September 13, 2018  ₱ 1,782,500.00 Sep-13-18 MMM-DD-YY
  1 downloads for this document last download from 66.249.66.26 on October 1, 2018.    
Reference No. Description Posted by
BID-BULLETIN-36.pdf REPAIR AND IMPROVEMENT OF REGIONAL HAVEN BUILDING-1, PERIMETER FENCE, DRAINAGE SYSTEM AND CANOPY OF BUILDING-2

Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
September 13, 2018  ₱2,755,000.00 Sep-13-18 MMM-DD-YY
  1 downloads for this document last download from 66.249.66.26 on October 1, 2018.    
Reference No. Description Posted by
MINUTES-39.pdf Repair and Improvement of RRCY Main Building ITB No. DSWDT-PB-2018-39 Approved Budget for the Contract (ABC): Php 1,496,000.00
MINUTES OF PRE-BID CONFERENCE
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
September 13, 2018  ₱ 1,496,000.00 Sep-10-18 MMM-DD-YY
  3 downloads for this document last download from 180.190.66.198 on November 8, 2018.    
Reference No. Description Posted by
MINUTES-38.pdf Repair and Improvement of Home for Girls Road Networlq Drainage System, Dormitory CR, Roofing and Ceiling of Administrative Building, Gate and Laundry Area ITB No. DSWDT-PB-2018-38 Approved Budget for the Contract (ABC): Php 1,550,211.00
MINUTES OF PRE-BID CONFERENCE
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
September 13, 2018  ₱1,550,211.00 Sep-10-18 MMM-DD-YY
  5 downloads for this document last download from 66.249.79.9 on November 24, 2018.    
Reference No. Description Posted by
MINUTES-37.pdf Repair and Improvement of AVRC II Road Network, Guardhouse, Back gate, Drainage System, Canteen, -Front Gate Canopy and Water pump ITB No. DSWDT-PB-2O18-37 Approved Budget for the Contract (ABC): php 1,782,500.00
MINUTES OF PRE-BID CONFERENCE
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
September 13, 2018  ₱ 1,782,500.00 Sep-10-18 MMM-DD-YY
  1 downloads for this document last download from 66.249.66.27 on October 1, 2018.    
Reference No. Description Posted by
MINUTES-36.pdf Repair and Improvement ofRegional Haven Building_1, perimeter F.ence, Drainage System and Canopy of Building-2 ITB No. DSWDT-PB-2018-36 Approved Budget for the Contract (ABC): php 2,755,000.00
MINUTf,S OF PRE-BID CONFERENCE
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
September 13, 2018  ₱ 2,755,000.00 Sep-10-18 MMM-DD-YY
  3 downloads for this document last download from 54.161.69.38 on October 14, 2018.    
Reference No. Description Posted by
BID-BULLETIN-ITB-33-2.pdf Rebidding of Lot 2 of Supply and Delivery of ICT and Sound Equipment Accessories with previous ITB No. DSWD7-PB-2018-21 Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
September 11, 2018  ₱ 632,628.00 Sep-11-18 MMM-DD-YY
  1 downloads for this document last download from 66.249.66.26 on October 1, 2018.    
Reference No. Description Posted by
Minutes-33-2.pdf Rebidding of Lot 2 of Supply and Delivery of ICT and Sound Equipment Accessories with previous ITB No. DSWD7-PB-2018-21 Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
September 11, 2018  ₱ 0.00 -DD-YY MMM-DD-YY
  1 downloads for this document last download from 66.249.66.27 on October 1, 2018.    
Reference No. Description Posted by
Minutes-30.pdf Completion of Home for Girls Two-Storey Building ITB No. DSWDT-PB-2018-30 Approved Budget for the Contract (ABC): Php f5,230,000.00
MINUTES OF PRE-BID CONFERENCE September 3,2018, 1:30 PM Home for Girls Conference Room, Camomot-Franza Rd., Labangon, Cebu City
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
September 7, 2018  ₱ 5,230,000.00 Sep-07-18 MMM-DD-YY
  3 downloads for this document last download from 52.5.77.183 on October 14, 2018.    
Reference No. Description Posted by
Minutes-29.pdf Construction ofAVRC II Bu.ding, Main Drainage, Road and Erectricar system ofthe Compound ITB No. DSWDT-PB_2018-29 Approved Budget for the Contract (ABC): php 42,104,000.00
MINUTES OF PRE.BID CONPERENCE September 3, 2018. 9:30 AM llome fbr Girls Conference Room, Camomoi_Franza Rd., Labangon, Cebu Citv
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
September 7, 2018  ₱ 42,104,000.00 Sep-07-18 MMM-DD-YY
  4 downloads for this document last download from 66.249.79.7 on November 29, 2018.    
Reference No. Description Posted by
BID-BULLETIN-30-1.pdf Completion of Home for Girls Two-Storey Building

Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
September 5, 2018  ₱ 15,230,000.00 Sep-05-18 MMM-DD-YY
  1 downloads for this document last download from 66.249.75.69 on September 20, 2018.    
Reference No. Description Posted by
BID-BULLETIN-29-1.pdf Construction of AVRC II Building, Main Drainage, Road and Electrical System of the Compound Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
September 5, 2018  ₱ 42,104,000.00 Sep-05-18 MMM-DD-YY
  1 downloads for this document last download from 66.249.75.73 on September 20, 2018.    
Reference No. Description Posted by
BID-BULLETIN-ITB-28-1.pdf Rebidding of Supply and Delivery/Installation of Home Appliances and Air-Conditioning Equipment Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
September 4, 2018  ₱ 3,023,247.00 Sep-04-18 MMM-DD-YY
  1 downloads for this document last download from 66.249.65.221 on September 21, 2018.    
Reference No. Description Posted by
Minutes-28.pdf Rebidding of Supply and Delivery/Installation of Home Appliances and Air-Conditioning Equipment Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
September 3, 2018  ₱ 3,023,247.00 MMM-DD-YY MMM-DD-YY
  4 downloads for this document last download from 66.249.79.9 on November 20, 2018.    
Reference No. Description Posted by
BID-BULLETIN-27-1.pdf Construction of RRCY Vocational Training Center and School Building

Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
August 20, 2018  ₱ 0.00 Aug-20-18 MMM-DD-YY
  6 downloads for this document last download from 66.249.69.152 on September 20, 2018.    
Reference No. Description Posted by
BID-BULLETIN-26-1.pdf Improvement of Existing RRCY Kitchen Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
August 20, 2018  ₱ 0.00 Aug-20-18 MMM-DD-YY
  1 downloads for this document last download from 66.249.69.152 on September 20, 2018.    
Reference No. Description Posted by
BID-BULLETIN-25-1_2.pdf Construction of PWD’s Accessibility and Ground Improvement of Regional Haven

Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
August 20, 2018  ₱ 0.00 Aug-20-18 MMM-DD-YY
  1 downloads for this document last download from 66.249.65.219 on September 20, 2018.    
Reference No. Description Posted by
minutes-24.pdf Supply and Delivery of Kitchen Utensils and Dry Goods

Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
August 3, 2018  ₱ 1,122,641.90 Jul-30-18 MMM-DD-YY
  9 downloads for this document last download from 54.161.69.38 on October 14, 2018.    
Reference No. Description Posted by
MINUTES-23.pdf Supply and Delivery/Installation of Furniture and Fixtures Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
August 3, 2018  ₱ 5,607,440.00 Jul-30-18 MMM-DD-YY
  8 downloads for this document last download from 66.249.79.41 on November 21, 2018.    
Reference No. Description Posted by
BULLETIN-24.pdf Supply and Delivery of Kitchen Utensils and Dry Goods Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
August 3, 2018  ₱ 1,122,641.90 Aug-02-18 MMM-DD-YY
  5 downloads for this document last download from 66.249.75.71 on September 19, 2018.    
Reference No. Description Posted by
BULLETIN-23.pdf Supply and Delivery/Installation of Furniture and Fixtures Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
August 3, 2018  ₱ 5,607,440 Aug-02-18 MMM-DD-YY
  3 downloads for this document last download from 52.5.77.183 on October 14, 2018.    
Reference No. Description Posted by
SUPPLEMENTAL-22-2_2.pdf Supply and Delivery/Installation of Home Appliances and Air-Conditioning Equipment Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
August 2, 2018  ₱ 3,023,247.00 Jul-31-18 MMM-DD-YY
  4 downloads for this document last download from 66.249.65.219 on September 20, 2018.    
Reference No. Description Posted by
SUPPLEMENTAL-22-2.pdf Supply and Delivery/Installation of Home Appliances and Air-Conditioning Equipment Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
August 2, 2018  ₱ 3,023,247.00 Jul-31-18 MMM-DD-YY
  2 downloads for this document last download from 66.249.69.150 on September 20, 2018.    
Reference No. Description Posted by
MINUTES-22.pdf Supply and Delivery/Installation of Home Appliances and Air-Conditioning Equipment Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
August 2, 2018  ₱ 3,023,247.00) Jul-27-18 MMM-DD-YY
  14 downloads for this document last download from 66.249.79.9 on November 17, 2018.    
Reference No. Description Posted by
MINUTES21.pdf Supply and Delivery of ICT and Sound Equipment Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
August 2, 2018  ₱ 1,960,528.00 Jul-27-18 MMM-DD-YY
  7 downloads for this document last download from 66.249.79.11 on November 20, 2018.    
Reference No. Description Posted by
ITB-20-MINUTES.pdf Procurement of Trucking and Hauling Services Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
July 27, 2018  ₱ 5,000,000.00 Jul-20-18 MMM-DD-YY
  3 downloads for this document last download from 122.53.58.250 on November 17, 2018.    
Reference No. Description Posted by
ITB-20-SUPPLEMENTAL.pdf Supplemental/Bid Bulletin
No.: DSWD7-PB-2018-20-1
LOT 1 – WING VAN TRUCK
LOT 2 – CONTAINER VAN WITH PRIME MOVER
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
July 27, 2018  ₱ 5,000,000.00 Jul-24-18 MMM-DD-YY
  2 downloads for this document last download from 66.249.65.221 on September 20, 2018.    
Reference No. Description Posted by
ITB-22.pdf Supply and Delivery/Installation of Home Appliances and Air-Conditioning Equipment Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
July 24, 2018  ₱ 3,023,247.00 Jul-24-18 MMM-DD-YY
  4 downloads for this document last download from 66.249.75.73 on September 19, 2018.    
Reference No. Description Posted by
ITB-21.pdf Supply and Delivery of ICT and Sound Equipment Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
July 24, 2018  ₱ 1,960,528.00 JUl-24-18 MMM-DD-YY
  3 downloads for this document last download from 66.249.66.26 on September 14, 2018.    
Reference No. Description Posted by
ITB-19.pdf Supplemental/Bid Bulletin
No.: DSWD7-PB-2018-19-1
Date: June 18, 2018


This Addendum is issued to clarify, modify or amend items stipulated in the INVITATION TO BID for Supply and Delivery of Office Supplies with ITB No. DSWD7-PB-2018-19, which shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on June 14, 2018, viz.
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
June 19, 2018  ₱ 3,479,868.00 Jun-19-18 Jun-26-18
  3 downloads for this document last download from 66.249.75.71 on September 18, 2018.    
Reference No. Description Posted by
bulletin-17.pdf Supplemental/Bid Bulletin
No.: DSWD7-PB-2018-17-1
Date: May 30, 2018


This Addendum is issued to clarify, modify or amend items stipulated in the INVITATION TO BID for Supply and Delivery of Ready-to-Wear Clothes for Stockpile of the Regional Warehouse with ITB No. DSWD7-PB-2018-17, which shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on May 29, 2018, viz.
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
June 1, 2018  ₱ 1,164,350.00 MMM-DD-YY Jun-13-18
  7 downloads for this document last download from 66.249.69.230 on November 13, 2018.    
Reference No. Description Posted by
BULLETIN-16.pdf Supplemental/Bid Bulletin
No.: DSWD7-PB-2018-16-1
Date: May 30, 2018


This Addendum is issued to clarify, modify or amend items stipulated in the INVITATION TO BID for Supply and Delivery of Toiletries for Stockpile of the Regional Warehouse with ITB No. DSWD7-PB-2018-16, which shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on May 29, 2018, viz.

Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
June 1, 2018  ₱ 1,648,000.00 MMM-DD-YY Jun-13-18
  6 downloads for this document last download from 66.249.75.71 on September 19, 2018.    
Reference No. Description Posted by
bulletin-4-philgeps.pdf Supplemental/Bid Bulletin
No.: DSWD7-NP-2018-04-1
Date: May 16, 2018

This Addendum is issued to clarify, modify or amend items stipulated in the INVITATION TO BID for the Negotiated Procurement after Two-Failed Biddings of Provision of Venue, Board and Lodging for Various Trainings (Pantawid Pamilya) with ITB No. DSWD7-NP-2018-04, which shall form an integral part thereof. Changes hereof were discussed during the Negotiation Conference on May 15, 2018, viz.
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
May 16, 2018  ₱ 2,016,000.00 May-16-18 MMM-DD-YY
  9 downloads for this document last download from 91.242.162.25 on November 28, 2018.    
Reference No. Description Posted by
BULLETIN-3.pdf Supplemental/Bid Bulletin
No.: DSWD7-NP-2018-03-1
Date: May 16, 2018

This Addendum is issued to clarify, modify or amend items stipulated in the INVITATION TO BID for the Negotiated Procurement after Two-Failed Biddings of Provision of Conference Facilities and Live-in Accommodation for the Orientation on Different National Laws on Older Person for Barangay Captains with ITB No. DSWD7-NP-2018-03, which shall form an integral part thereof. Changes hereof were discussed during the Negotiation Conference on May 15, 2018, viz.
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
May 16, 2018  ₱ 1,804,500.00 May-16-18 MMM-DD-YY
  5 downloads for this document last download from 91.242.162.4 on November 27, 2018.    
Reference No. Description Posted by
Supplemental-13.pdf SUPPLEMENTAL/BID BULLETIN


This Addendum No. DSWD7-PB-2018-13-1 dated April 16, 2018, is issued to clarify, modify or amend items in the Bidding Documents of ITB No. DSWD7-PB-2018-13, Rebidding of Provision of Conference Facilities and Live-in Accommodation for the Orientation on Different National Laws on Older Person for Barangay Captains, and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on April 16, 2018, viz.
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
April 17, 2018  ₱ 1,804,500.00 Apr-17-18 Apr-30-18
  12 downloads for this document last download from 91.242.162.25 on November 28, 2018.    
Reference No. Description Posted by
Supplemental-14.pdf SUPPLEMENTAL/BID BULLETIN


This Addendum No. DSWD7-PB-2018-14-1 dated April 16, 2018, is issued to clarify, modify or amend items in the Bidding Documents of ITB No. DSWD7-PB-2018-14, Rebidding of Provision of Venue, Board and Lodging for Various Trainings, and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on April 16, 2018, viz.

Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
April 17, 2018  ₱ 2,016,000.00 Apr-17-18 APR-30-18
  6 downloads for this document last download from 91.242.162.25 on November 28, 2018.    
Reference No. Description Posted by
ITB-01-Bid-Bulletin-Negotiated-POL.pdf SUPPLEMENTAL/BID BULLETIN


This Addendum No. DSWD7-NP-2018-01-1 March 28, 2018 is INVITATION TO BID FOR THE NEGOTIATED PROCUREMENT of “Provision of Petroleum, Oil and Lubricants for CY 2018 using Fleet Card Facility” AFTER TWO-FAILED BIDDING” and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on March 27, 2018, viz.

Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
March 28, 2018  ₱1,507,500.00 Mar-28-18 Apr-10-18
  9 downloads for this document last download from 91.242.162.25 on November 28, 2018.    
Reference No. Description Posted by
ITB-11-Venue-for-Various-trainings.docx SUPPLEMENTAL/BID BULLETIN


This Addendum No. DSWD7-PB-2018-11-1 March 15, 2018 is issued to clarify, modify or amend items in the Bidding Documents of ITB No. DSWD7-PB-2018-11, Provision of Venue, Board and Lodging for Various Trainings, and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on March 13, 2018, viz.
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
March 16, 2018  ₱ 2,016,000.00 Mar-16-18 Mar-26-18
  12 downloads for this document last download from 91.242.162.25 on November 28, 2018.    
Reference No. Description Posted by
18-0271.xlsx Communication Load Credits (Globe AMAX) through Automatic Loading system for CY 2018 Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
February 28, 2018  ₱2,960,100.00 Mar-1-18 Mar-07-18
  19 downloads for this document last download from 91.242.162.4 on November 27, 2018.    
Reference No. Description Posted by
RFQ-18-0270.xlsx Communication Load Credits (Smart Bizload) through Automatic Loading system CY 2018
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
February 28, 2018  ₱ 3,230,500.00 Mar-01-18 Mar-06-18
  18 downloads for this document last download from 91.242.162.4 on November 28, 2018.    
Reference No. Description Posted by
ITB-10-Venue-Older-Persons-Supplemental-1.docx SUPPLEMENTAL/BID BULLETIN


This Addendum No. DSWD7-PB-2018-10-1 dated February 20, 2018 is issued to notify the public that ITB No. DSWD7-PB-2018-10, Provision of Conference Facilities and Live-in Accommodation for the Orientation on Different National Laws on Older Person for Barangay Captains”, has been postponed due to unavoidable circumstance, viz:
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
February 20, 2018  ₱ 1,804,500.00 Feb-20-18 Mar-07-18
  11 downloads for this document last download from 91.242.162.25 on November 28, 2018.    
Reference No. Description Posted by
ITB-09-Tarpaulins.docx SUPPLEMENTAL/BID BULLETIN


This Addendum No. DSWD7-PB-2018-09-1 dated February 15, 2018 is issued to clarify, modify or amend items in the Bidding Documents of ITB No. DSWD7-PB-2018-09, “Supply and Delivery of SFP 10 Kumainments Tarpaulins” and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on February 15, 2018, viz.
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
February 19, 2018  ₱ 1,157,500.00 Feb-19-18 Feb-27-18
  45 downloads for this document last download from 68.132.231.121 on December 3, 2018.    
Reference No. Description Posted by
ITB-08-Advocacy-Fans.docx SUPPLEMENTAL/BID BULLETIN


This Addendum No. DSWD7-PB-2018-08-1 dated February 19, 2018 is issued to clarify, modify or amend items in the Bidding Documents of ITB No. DSWD7-PB-2018-08, “Supply and Delivery of SFP Advocacy Fans” and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on February 15, 2018, viz.
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
February 19, 2018  ₱ 1,000.000.00 Feb-19-18 Feb-27-18
  11 downloads for this document last download from 66.249.66.33 on October 1, 2018.    
Reference No. Description Posted by
ITB-07-Advocacy-Bags.docx SUPPLEMENTAL/BID BULLETIN


This Addendum No. DSWD7-PB-2018-07-1 dated February 19, 2018 is issued to clarify, modify or amend items in the Bidding Documents of ITB No. DSWD7-PB-2018-07, “Supply and Delivery of SFP Advocacy Bags” and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on February 15, 2018, viz.
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
February 19, 2018  ₱ 2,325,000.00 Feb-19-18 Feb-27-18
  13 downloads for this document last download from 66.249.79.7 on November 15, 2018.    
Reference No. Description Posted by
ITB-06-Hand-Towels.docx SUPPLEMENTAL/BID BULLETIN


This Addendum No. DSWD7-PB-2018-06-1 dated February 15, 2018 is issued to clarify, modify or amend items in the Bidding Documents of ITB No. DSWD7-PB-2018-06, “Supply and Delivery of SFP Custom Embroidered Hand Towels” and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on February 15, 2018, viz.

Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
February 19, 2018  ₱ 7,125,000.00 Feb-19-18 Feb-27-18
  26 downloads for this document last download from 66.249.79.7 on November 15, 2018.    
Reference No. Description Posted by
ITB-05-Janitorial.docx SUPPLEMENTAL/BID BULLETIN


This Addendum No. DSWD7-PB-2018-05-1 dated February 15, 2018 is issued to clarify, modify or amend items in the Bidding Documents of ITB No. DSWD7-PB-2018-05, “Provision of Janitorial Manpower Services for CY 2018” and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on February 15, 2018, viz.

Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
February 19, 2018  ₱ 1,940,000.00 Feb-19-18 Feb-27-18
  13 downloads for this document last download from 66.249.65.220 on September 20, 2018.    
Reference No. Description Posted by
ITB-04-Additional-Security-Services-No.-2.docx SUPPLEMENTAL/BID BULLETIN


This Addendum No. DSWD7-PB-2018-04-2 dated February 8, 2018 is issued to clarify, modify or amend items in the Bidding Documents of ITB No. DSWD7-PB-2018-04, “Provision of Additional Security Manpower Services for CY 2018” and shall form an integral part thereof.

Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
February 8, 2018  ₱ 3,150,000.00 Feb-08-18 Feb-19-18
  13 downloads for this document last download from 91.242.162.25 on November 28, 2018.    
Reference No. Description Posted by
ITB-03-Toner-Cartridges.docx SUPPLEMENTAL/BID BULLETIN


This Addendum No. DSWD7-PB-2018-03-1 dated February 7, 2018 is issued to clarify, modify or amend items in the Bidding Documents of ITB No. DSWD7-PB-2018-03, “Supply and Delivery of Toner Cartridges for Printers” and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on February 6, 2018, viz.

Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
February 7, 2018  ₱ 2,262,500.00 MMM-DD-YY MMM-DD-YY
  11 downloads for this document last download from 91.242.162.25 on November 28, 2018.    
Reference No. Description Posted by
ITB-04-Additional-Security-Services.docx SUPPLEMENTAL/BID BULLETIN


This Addendum No. DSWD7-PB-2018-04-1 dated February 7, 2018 is issued to clarify, modify or amend items in the Bidding Documents of ITB No. DSWD7-PB-2018-04, “Provision of Additional Security Manpower Services for CY 2018” and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on February 6, 2018, viz.

Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
February 7, 2018  ₱ 3,150,000.00 -DD-YY MMM-DD-YY
  17 downloads for this document last download from 91.242.162.25 on November 28, 2018.    
Reference No. Description Posted by
02-Bid-Bulletin-Provision-of-POL.docx SUPPLEMENTAL/BID BULLETIN


This Addendum No. DSWD7-PB-2018-02-1 dated February 1, 2018 is issued to clarify, modify or amend items in the Bidding Documents of ITB No. DSWD7-PB-2018-02, “Provision of Petroleum, Oil and Lubricants for CY 2018 using Fleet Card Facility” and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on January 31, 2018, viz.

Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
February 2, 2018  ₱ 0.00 Feb-02-18 MMM-DD-YY
  16 downloads for this document last download from 91.242.162.25 on November 28, 2018.    
Reference No. Description Posted by
01-Bid-Bulletin-Fresh-Meat-Groceries.docx SUPPLEMENTAL/BID BULLETIN


This Addendum No. DSWD7-PB-2018-01-1 dated January 16, 2018 is issued to clarify, modify or amend items in the Bidding Documents of ITB No. DSWD7-PB-2018-01, “Supply and Delivery of Fresh Meat and Groceries for CY 2018 Use of Residential Centers” and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on January 16, 2018, viz.

Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
January 18, 2018  ₱ 2,738,683.00 Jan-09-18 Jan-29-18
  20 downloads for this document last download from 91.242.162.25 on November 28, 2018.    
Reference No. Description Posted by
07-Bid-Bulletin-NP-Security-Services.docx SUPPLEMENTAL/BID BULLETIN

This Addendum No. DSWD7-NP-2017-07-1 dated October 13, 2017 is issued to clarify, modify or amend items in the Bidding Documents of ITB No. DSWD7-NP-2017-07, “Negotiated Procurement of “Provision of Skills Training on Security Services NC I (Basic Security Guard Course) to SLP Beneficiaries” After Two Failed Biddings” and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on October 10, 2017, viz.
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
October 20, 2017  ₱ 6,900,000.00 Oct-20-17 Oct-24-17
  24 downloads for this document last download from 91.242.162.25 on November 28, 2018.    
Reference No. Description Posted by
62-Bid-Bulletin-Instant-Coffee.docx SUPPLEMENTAL/BID BULLETIN

This Addendum No. DSWD7-PB-2017-62-1 dated October 13, 2017 is issued to clarify, modify or amend items in the Bidding Documents and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on October 10, 2017, viz.
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
October 19, 2017  ₱ 5,062,800.00 Oct-19-17 Oct-24-17
  23 downloads for this document last download from 91.242.162.25 on November 28, 2018.    
Reference No. Description Posted by
61-Bid-Bulletin-Automotive.docx SUPPLEMENTAL/BID BULLETIN

This Addendum No. DSWD7-PB-2017-61-1 dated October 13, 2017 is issued to clarify, modify or amend items in the Bidding Documents and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on October 10, 2017, viz.
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
October 19, 2017  ₱ 4,588,750.00 Oct-19-17 Oct-24-17
  23 downloads for this document last download from 91.242.162.25 on November 28, 2018.    
Reference No. Description Posted by
67-Bid-Bulletin-Driving-Bohol.docx SUPPLEMENTAL/BID BULLETIN

This Addendum No. DSWD7-PB-2017-67-1 dated October 18, 2017 is issued to clarify, modify or amend items in the Bidding Documents of ITB No. DSWD7-PB-2017-67, “Provision of Skills Training on Driving NC II to SLP Beneficiaries in Bohol” (Redding of ITB No. DSWD7-PB-2017-57) and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on October 10, 2017, viz.
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
October 19, 2017  ₱ 1,587,330.00 Oct-19-17 Oct-25-17
  21 downloads for this document last download from 91.242.162.25 on November 28, 2018.    
Reference No. Description Posted by
66-Bid-Bulletin-Electrical-Bohol.docx SUPPLEMENTAL/BID BULLETIN

This Addendum No. DSWD7-PB-2017-66-1 dated October 18, 2017 is issued to clarify, modify or amend items in the Bidding Documents of ITB No. DSWD7-PB-2017-66, “Provision of Skills Training on Electrical Installation and Maintenance NC II to SLP Beneficiaries in Bohol” and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on October 10, 2017, viz.

Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
October 19, 2017  ₱ 4,625,970.00 OCt-19-17 Oct-25-17
  24 downloads for this document last download from 91.242.162.25 on November 28, 2018.    
Reference No. Description Posted by
64-Bid-Bulletin-Canned-Fish.docx SUPPLEMENTAL/BID BULLETIN

This Addendum No. DSWD7-PB-2017-64-1 dated October 18, 2017 is issued to clarify, modify or amend items in the Bidding Documents and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on October 10, 2017, viz.
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
October 19, 2017  ₱ 3,507,900.00 Oct-19-17 Oct-24-17
  21 downloads for this document last download from 91.242.162.25 on November 28, 2018.    
Reference No. Description Posted by
63-Bid-Bulletin-Canned-Meat.docx SUPPLEMENTAL/BID BULLETIN

This Addendum No. DSWD7-PB-2017-63-1 dated October 18, 2017 is issued to clarify, modify or amend items in the Bidding Documents and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on October 10, 2017, viz.
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
October 19, 2017  3,349,248.00 Oct-19-17 Oct-24-17
  20 downloads for this document last download from 66.249.66.61 on October 1, 2018.    
Reference No. Description Posted by
Bid-Bulletin-ITB-60-advocacy-bags.docx Supply and Delivery of Supplementary Feeding Program (SFP) Advocacy Bags Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
September 20, 2017  ₱ 0.00 MMM-DD-YY MMM-DD-YY
  22 downloads for this document last download from 91.242.162.25 on November 28, 2018.    
Reference No. Description Posted by
54-Bid-Bulletin-Beauty-Care.docx SUPPLEMENTAL/BID BULLETIN

This Addendum No. DSWD7-PB-2017-54-1 dated August 22, 2017 is issued to clarify, modify or amend items in the Bidding Documents and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on August 17, 2017, viz.
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
August 23, 2017  ₱ 2,108,100.00 MMM-DD-YY MMM-DD-YY
  31 downloads for this document last download from 91.242.162.25 on November 28, 2018.    
Reference No. Description Posted by
53-Bid-Bulletin-Electrical.docx SUPPLEMENTAL/BID BULLETIN

This Addendum No. DSWD7-PB-2017-53-1 dated August 22, 2017 is issued to clarify, modify or amend items in the Bidding Documents and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on August 17, 2017, viz.
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
August 23, 2017  ₱1,156,492.50 MMM-DD-YY MMM-DD-YY
  29 downloads for this document last download from 91.242.162.25 on November 28, 2018.    
Reference No. Description Posted by
52-Bid-Bulletin-Toners.docx SUPPLEMENTAL/BID BULLETIN

This Addendum No. DSWD7-PB-2017-52-1 dated August 22, 2017 is issued to clarify, modify or amend items in the Bidding Documents and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on August 17, 2017, viz.
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
August 23, 2017  ₱ 1,078,360.00 MMM-DD-YY MMM-DD-YY
  28 downloads for this document last download from 91.242.162.25 on November 28, 2018.    
Reference No. Description Posted by
50-Bid-Bulletin-Housekeeping.docx SUPPLEMENTAL/BID BULLETIN


This Addendum No. DSWD7-PB-2017-50-1 dated August 22, 2017 is issued to clarify, modify or amend items in the Bidding Documents and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on August 17, 2017, viz.
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
August 23, 2017  ₱ 2,600,000.00 MMM-DD-YY MMM-DD-YY
  28 downloads for this document last download from 110.54.185.67 on December 8, 2018.    
Reference No. Description Posted by
49-Bid-Bulletin-Haircutting.docx SUPPLEMENTAL/BID BULLETIN


This Addendum No. DSWD7-PB-2017-49-1 dated August 22, 2017 is issued to clarify, modify or amend items in the Bidding Documents and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on August 16, 2017, viz.
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
August 23, 2017  ₱ 1,000,000.00 MMM-DD-YY MMM-DD-YY
  27 downloads for this document last download from 91.242.162.25 on November 28, 2018.    
Reference No. Description Posted by
48-Bid-Bulletin-F-and-B.docx SUPPLEMENTAL/BID BULLETIN


This Addendum No. DSWD7-PB-2017-48-1 dated August 22, 2017 is issued to clarify, modify or amend items in the Bidding Documents and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on August 15, 2017, viz.

Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
August 23, 2017  ₱ 1,000,000.00 MMM-DD-YY MMM-DD-YY
  23 downloads for this document last download from 91.242.162.25 on November 28, 2018.    
Reference No. Description Posted by
47-Bid-Bulletin-Canned-Meat.docx SUPPLEMENTAL/BID BULLETIN

This Addendum No. DSWD7-PB-2017-47-1 dated August 22, 2017 is issued to clarify, modify or amend items in the Bidding Documents and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on August 15, 2017, viz.
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
August 23, 2017  ₱ 277,733.50 MMM-DD-YY MMM-DD-YY
  24 downloads for this document last download from 66.249.66.61 on October 1, 2018.    
Reference No. Description Posted by
Bid-Bulletin-ITB-PB-45-Venue.docx SUPPLEMENTAL/BID BULLETIN


This Addendum No. DSWD7-PB-2017-45-1 dated August 3, 2017 is issued to clarify, modify or amend items in the Bidding Documents and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on August 2, 2017, viz.
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
August 4, 2017  ₱ 0.00 Aug-04-17 MMM-DD-YY
  27 downloads for this document last download from 66.249.79.225 on November 24, 2018.    
Reference No. Description Posted by
44-Bid-Bulletin-Plastic-Bags.docx SUPPLEMENTAL/BID BULLETIN

This Addendum No. DSWD7-PB-2017-44-1 dated July 31, 2017 is issued to clarify, modify or amend items in the Bidding Documents and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on July 26, 2017, viz.

Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
July 31, 2017  ₱ 0.00 JUL-31-17 MMM-DD-YY
  29 downloads for this document last download from 66.249.75.141 on October 21, 2018.    
Reference No. Description Posted by
43-Bid-Bulletin-Office-Supplies.docx SUPPLEMENTAL/BID BULLETIN


This Addendum No. DSWD7-PB-2017-43-1 dated July 31, 2017 is issued to clarify, modify or amend items in the Bidding Documents and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on July 26, 2017, viz.
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
July 31, 2017  ₱ 0.00 JUL-31-17 MMM-DD-YY
  30 downloads for this document last download from 66.249.65.167 on September 22, 2018.    
Reference No. Description Posted by
Bid-Bulletin-ITB-PB-42-DomRAC.docx SUPPLEMENTAL/BID BULLETIN


This Addendum No. DSWD7-PB-2017-42-1 dated July 28, 2017 is issued to clarify, modify or amend items in the Bidding Documents and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on July 26, 2017, viz.

Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
July 31, 2017  ₱ 0.00 JUL-31-17 MMM-DD-YY
  27 downloads for this document last download from 66.249.65.97 on September 22, 2018.    
Reference No. Description Posted by
Bid-Bulletin-ITB-PB-41-SMAW.docx SUPPLEMENTAL/BID BULLETIN


This Addendum No. DSWD7-PB-2017-41-1 dated July 28, 2017 is issued to clarify, modify or amend items in the Bidding Documents and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on July 26, 2017, viz.
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
July 31, 2017  ₱ 0.00 JUL-31-17 MMM-DD-YY
  25 downloads for this document last download from 66.249.66.61 on October 1, 2018.    
Reference No. Description Posted by
Bid-Bulletin-ITB-PB-40-Hilot-Cebu.docx
SUPPLEMENTAL/BID BULLETIN


This Addendum No. DSWD7-PB-2017-40-1 dated July 28, 2017 is issued to clarify, modify or amend items in the Bidding Documents and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on July 26, 2017, viz.
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
July 31, 2017  ₱ 0.00 JUL-31-17 MMM-DD-YY
  29 downloads for this document last download from 66.249.65.167 on September 23, 2018.    
Reference No. Description Posted by
Bid-Bulletin-ITB-PB-39-Security-Bohol.docx SUPPLEMENTAL/BID BULLETIN


This Addendum No. DSWD7-PB-2017-39-1 dated July 27, 2017 is issued to clarify, modify or amend items in the Bidding Documents and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on July 25, 2017, viz.

Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
July 28, 2017  ₱ 0.00 JUL-28-17 MMM-DD-YY
  27 downloads for this document last download from 66.249.65.167 on September 22, 2018.    
Reference No. Description Posted by
Bid-Bulletin-ITB-PB-38-Security-Cebu.docx SUPPLEMENTAL/BID BULLETIN


This Addendum No. DSWD7-PB-2017-38-1 dated July 27, 2017 is issued to clarify, modify or amend items in the Bidding Documents and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on July 25, 2017, viz.
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
July 28, 2017  ₱ 0.00 JUL-28-17 MMM-DD-YY
  30 downloads for this document last download from 66.249.65.169 on September 22, 2018.    
Reference No. Description Posted by
Bid-Bulletin-ITB-PB-37-Security-rebidding.docx SUPPLEMENTAL/BID BULLETIN


This Addendum No. DSWD7-PB-2017-37-1 dated July 27, 2017 is issued to clarify, modify or amend items in the Bidding Documents and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on July 25, 2017, viz.
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
July 28, 2017  ₱ 0.00 JUL-28-17 MMM-DD-YY
  27 downloads for this document last download from 66.249.66.33 on October 1, 2018.    
Reference No. Description Posted by
Bid-Bulletin-ITB-PB-34-Beauty-Care.docx SUPPLEMENTAL/BID BULLETIN


This Addendum No. DSWD7-PB-2017-34-1 dated July 27, 2017 is issued to clarify, modify or amend items in the Bidding Documents and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on July 25, 2017, viz.

Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
July 28, 2017  ₱ 0.00 JUL-28-17 MMM-DD-YY
  29 downloads for this document last download from 66.249.66.63 on October 1, 2018.    
Reference No. Description Posted by
Bid-Bulletin-ITB-PB-33-Housekeeping.docx SUPPLEMENTAL/BID BULLETIN


This Addendum No. DSWD7-PB-2017-33-1 dated July 27, 2017 is issued to clarify, modify or amend items in the Bidding Documents and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference on July 25, 2017, viz.

Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
July 28, 2017  ₱ 0.00 JUL-28-17 MMM-DD-YY
  28 downloads for this document last download from 66.249.66.63 on November 23, 2018.    
Reference No. Description Posted by
BidSupplementViewUINP-05.pdf SUPPLEMENTAL/BID BULLETIN


This Addendum No. DSWD7-NP-2017-05-1 dated July 14, 2017 is issued to clarify, modify or amend items in the Bidding Documents and shall form an integral part thereof. Changes hereof were discussed during the Pre-Negotiation Conference on July 12, 2017, viz.

Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
July 17, 2017  
  8 downloads for this document last download from 91.242.162.25 on November 28, 2018.    
Reference No. Description Posted by
Supplemental-ITB-No.-31.pdf SUPPLEMENTAL/BID BULLETIN

Labor and Materials for RRCY’s Construction Project

This Addendum No. DSWD7-PB-2017-31-01 dated June 28, 2017 is issued to clarify, modify or amend items in the Bidding Documents and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference last June 27, 2017, viz.

Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
July 7, 2017  ₱ 0.00 MMM-DD-YY MMM-DD-YY
  8 downloads for this document last download from 91.242.162.25 on November 28, 2018.    
Reference No. Description Posted by
Supplemental-Bid-Bulletin-Itb-No.-28.pdf SUPPLEMENTAL/BID BULLETIN

Provision of Various Skills Training to SLP Beneficiaries

This Addendum No. DSWD7-PB-2017-28-01 dated June 23, 2017 is issued to clarify, modify or amend items in the Bidding Documents and shall form an integral part thereof. Changes hereof were discussed during the Pre-bid Conference last June 22, 2017, viz.

Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
June 27, 2017  ₱ 19,000,000.00 M-DD-YY MMM-DD-YY
  10 downloads for this document last download from 91.242.162.25 on November 28, 2018.    
Reference No. Description Posted by
26-Bulletin-covered-activity-center-HFG.doc SUPPLEMENTAL/BID BULLETIN

Rebidding of the Labor and Materials for the Construction of Covered Activity Center - HFG
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
June 19, 2017  ₱ 0.00 MMM-DD-YY MMM-DD-YY
  13 downloads for this document last download from 91.242.162.25 on November 28, 2018.    
Reference No. Description Posted by
27-Bulletin-Rebidding-NIR-Toner.doc SUPPLEMENTAL/BID BULLETIN

Rebidding of Supply and Delivery of Ink and Cartridges for Various Printers of DSWD NIR
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
June 19, 2017  ₱ 0.00 MMM-DD-YY MMM-DD-YY
  9 downloads for this document last download from 91.242.162.25 on November 28, 2018.    
Reference No. Description Posted by
25-Bulletin-Food-Beverage.doc SUPPLEMENTAL/BID BULLETIN

Provision of Skills Training to SLP Beneficiaries on Food & Beverage Services NC II
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
June 19, 2017  ₱ 0.00 MMM-DD-YY MMM-DD-YY
  10 downloads for this document last download from 91.242.162.25 on November 28, 2018.    
Reference No. Description Posted by
23-Bulletin-Skills-Training-Part2.doc SUPPLEMENTAL/BID BULLETIN

Provision of Various Skills Training to SLP Beneficiaries

This Addendum No. DSWD7-PB-2017-23-01 dated May 30, 2017 is issued to clarify, modify or amend items in the Bidding Documents and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference last May 29, 2017, viz.
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
May 31, 2017  ₱ 0.00 MMM-DD-YY MMM-DD-YY
  16 downloads for this document last download from 66.249.66.33 on December 6, 2018.    
Reference No. Description Posted by
NP_03-Bulletin_Welding.doc SUPPLEMENTAL/BID BULLETIN

Negotiation on the Provision of Skills Training to SLP Beneficiaries particularly on Skills Training on Shielded Metal Arc Welding NC II

This Addendum No. DSWD7-NP-2017-03 dated May 31, 2017 is issued to clarify, modify or amend items in the Bidding Documents and shall form an integral part thereof. Changes hereof were discussed during the Prebid Conference last May 30, 2017, viz:
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
May 31, 2017  ₱ 0.00 MMM-DD-YY MMM-DD-YY
  10 downloads for this document last download from 91.242.162.25 on November 28, 2018.    
Reference No. Description Posted by
20-Bulletin-Clothing_Hygiene-Kit.doc
SUPPLEMENTAL/BID BULLETIN

Supply and Delivery of Clothing and Hygiene Kits
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
May 25, 2017  ₱ 0.00 MMM-DD-YY MMM-DD-YY
  13 downloads for this document last download from 91.242.162.25 on November 28, 2018.    
Reference No. Description Posted by
19_2-Bulletin-Toner-NIR.doc SUPPLEMENTAL/BID BULLETIN


Supply and Delivery of Ink and Cartridges for Various Printers of DSWD NIR
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
May 25, 2017  ₱ 0.00 MMM-DD-YY MMM-DD-YY
  13 downloads for this document last download from 66.249.79.225 on November 25, 2018.    
Reference No. Description Posted by
22-Bulletin-Hotel-Services_MCCT.doc SUPPLEMENTAL/BID BULLETIN

Services for Board and Lodging, Catering and Use of Venue for the MCCT Parent Leaders Training Level II in Cebu City
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
May 23, 2017  ₱ 0.00 MMM-DD-YY MMM-DD-YY
  14 downloads for this document last download from 180.190.198.101 on December 6, 2018.    
Reference No. Description Posted by
21-Bulletin-Covered-Acivity-Center.doc SUPPLEMENTAL/BID BULLETIN


Labor and Materials for the Construction of Covered Activity Center
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
May 23, 2017  ₱ 0.00 MMM-DD-YY MMM-DD-YY
  15 downloads for this document last download from 66.249.69.191 on December 1, 2018.    
Reference No. Description Posted by
supplemental-19.pdf Supply and Delivery of Ink and Cartridges for Various Printers of DSWD NIR CHANGE OF TIME
Reinaflor Visto
Posted on Approved Budget for the Contract Open Close
May 18, 2017  ₱ 0.00 MMM-DD-YY MMM-DD-YY
  11 downloads for this document last download from 66.249.75.71 on September 20, 2018.  
231 Views
Print Friendly, PDF & Email

Archived Posts

Posts Category

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